MCL Dewatering Sets Tender 2026 | Lahore E-Tender Notice

MCL Dewatering Sets Tender 2026 | Lahore E-Tender Notice
Introduction to MCL Dewatering Sets Tender 2026
The MCL Dewatering Sets Tender 2026 is one of the latest procurement opportunities announced by Metropolitan Corporation Lahore (MCL) for the supply of dewatering sets along with required accessories. The project has been launched to strengthen Lahore's drainage and emergency water removal capabilities, particularly during the monsoon season when urban flooding becomes a recurring challenge.
From experience, drainage-related tenders often receive strong competition because they directly support essential city infrastructure. In many cases, contractors who specialize in pumps, water management systems, and municipal equipment find these projects highly attractive due to their relatively short execution timelines and government-backed payment structures.
Why This Tender Matters
Lahore continues to face significant pressure on its drainage network during heavy rainfall. Dewatering equipment plays a critical role in removing accumulated water from roads, underpasses, public facilities, and low-lying urban areas. By investing in modern dewatering systems, MCL aims to improve emergency response capabilities and reduce disruption caused by seasonal flooding.
One common mistake people make is assuming that government tenders are only suitable for large corporations. In reality, many public-sector procurement opportunities are designed for eligible local contractors, suppliers, and engineering firms that meet the required technical and financial criteria.
Key Tender Information at a Glance
- Issuing Organization: Metropolitan Corporation Lahore (MCL)
- Project: Supply of Dewatering Sets Along With Accessories
- Estimated Cost: Rs. 3.687 Million
- Earnest Money: 3% of Estimated Cost
- Tender Submission Date: 19 June 2026 at 10:30 AM
- Tender Opening Date: 19 June 2026 at 11:00 AM
- Completion Period: 30 Days
- Procurement Method: Single Stage One Envelope
Who Should Read This Guide?
This guide is especially useful for contractors, engineering suppliers, procurement consultants, infrastructure companies, and businesses interested in participating in the MCL Dewatering Sets Tender 2026. The following sections explain eligibility requirements, submission procedures, bid evaluation methods, and practical tips that can help improve compliance during the bidding process.
What Is the MCL Dewatering Sets Tender?
The MCL Dewatering Sets Tender 2026 is a public procurement project announced by Metropolitan Corporation Lahore to acquire dewatering pump sets and related accessories. These systems are commonly used to remove excess water from flooded roads, underpasses, construction sites, and other urban locations where water accumulation can disrupt daily activities.
In many cases, cities invest in dewatering equipment before the monsoon season to improve emergency preparedness. Lahore is no exception. With increasing urban development and seasonal rainfall challenges, reliable pumping equipment has become an important part of municipal infrastructure planning.
Purpose of the Procurement
The primary objective of this tender is to strengthen Lahore's ability to manage rainwater and emergency drainage situations. Fast water removal helps reduce traffic disruption, protects public assets, and minimizes safety risks for residents.
From experience, municipal authorities prefer modern and durable pumping systems because equipment failures during emergencies can create costly delays. This is one reason why government agencies usually define strict technical and quality requirements within bidding documents.
What Is Included in the Supply?
The successful bidder will be responsible for supplying dewatering sets along with associated accessories as specified in the tender documents. While detailed technical specifications must be reviewed through the official bidding documents, contractors should expect requirements related to equipment quality, operational performance, and delivery standards.
- Dewatering pump sets
- Operational accessories
- Supporting components required for functionality
- Documentation and compliance requirements
- Delivery within the specified contract period
Why Dewatering Equipment Is Important
One common mistake people make is underestimating the importance of dewatering systems in urban management. During heavy rainfall, even a few hours of standing water can affect transportation routes, businesses, and emergency services.
A similar discussion often appears on public infrastructure forums and community platforms where contractors highlight how efficient pumping systems can significantly reduce recovery time after storms. Municipal corporations across Pakistan continue investing in these solutions because prevention is often less expensive than dealing with flood-related damage later.
Project Scope Overview
The MCL Dewatering Sets Tender 2026 is not a construction project. Instead, it focuses on equipment procurement. Contractors and suppliers with experience in industrial pumps, water management equipment, municipal machinery, and related infrastructure supplies are likely to find this opportunity most relevant.
Tender Overview and Key Information
Before preparing a bid for the MCL Dewatering Sets Tender 2026, contractors should understand the core details of the procurement process. Missing a requirement or misunderstanding a deadline can result in disqualification, even when a supplier offers a competitive price.
From experience, successful bidders usually begin by reviewing the tender summary, financial requirements, eligibility conditions, and submission procedures before preparing technical documents. This approach reduces errors and helps ensure compliance with procurement regulations.
Official Tender Summary
| Tender Information | Details |
|---|---|
| Issuing Organization | Metropolitan Corporation Lahore (MCL) |
| Project Name | Supply of Dewatering Sets Along With Accessories |
| Estimated Cost | Rs. 3.687 Million |
| Earnest Money | 3% of Estimated Cost |
| Submission Date | 19 June 2026 at 10:30 AM |
| Opening Date | 19 June 2026 at 11:00 AM |
| Completion Period | 30 Days |
| Procurement Method | Single Stage One Envelope |
| Evaluation Method | Least Cost Method |
Understanding the Procurement Method
The tender follows the Single Stage One Envelope procedure. This means contractors submit technical and financial information together in a single bid package through the electronic procurement system.
In many cases, this method speeds up procurement because authorities evaluate responsive bids without requiring multiple submission stages. However, it also means that every required document must be complete at the time of submission.
Financial Commitment Required from Bidders
Interested contractors must provide earnest money equal to 3% of the estimated project value. Based on the announced cost, the bid security is approximately Rs. 110,610. The security must be submitted according to tender instructions and supported by the required financial documentation.
- Earnest money must be submitted in the prescribed format.
- Original financial instrument must be provided before bid closing.
- Scanned copies must also be uploaded through EPADS.
- Failure to comply may result in bid rejection.
Why These Details Matter
One common mistake people make is focusing only on pricing while ignoring administrative requirements. Government procurement processes are highly compliance-driven. Even a small documentation issue can eliminate an otherwise competitive bid. Reviewing these key details early helps suppliers avoid unnecessary disqualification and improves their chances of successful participation in the MCL Dewatering Sets Tender 2026.
Technical Specifications of Dewatering Sets
The technical requirements play a major role in determining whether a bid remains responsive during evaluation. While the official bidding documents contain the complete specifications, contractors should understand the general expectations associated with municipal dewatering equipment before preparing their proposals.
From experience, government agencies rarely focus on price alone. Equipment reliability, operational efficiency, durability, and compliance with technical standards often influence procurement decisions. A low-cost bid may still face rejection if the supplied equipment fails to meet the required performance criteria.
What Are Dewatering Sets Used For?
Dewatering sets are specialized pumping systems designed to remove accumulated water from urban and industrial locations. Municipal authorities commonly use them during heavy rainfall, drainage emergencies, infrastructure maintenance, and flood response operations.
- Road and street drainage.
- Underpass water removal.
- Emergency flood management.
- Construction site dewatering.
- Stormwater control operations.
- Municipal drainage support.
Expected Technical Requirements
Although bidders must rely on the official tender documents for exact specifications, authorities typically assess equipment based on performance, operational capability, and long-term reliability.
| Evaluation Area | Importance |
|---|---|
| Pumping Capacity | Supports rapid water removal |
| Equipment Durability | Ensures long service life |
| Operational Reliability | Critical during emergencies |
| Accessory Compatibility | Supports complete functionality |
| Maintenance Requirements | Affects long-term operating costs |
Common Factors Evaluators Look For
One common mistake people make is assuming that product brochures alone are enough to demonstrate compliance. Procurement teams often require supporting documentation that proves the equipment can perform according to the tender requirements.
- Technical data sheets.
- Manufacturer specifications.
- Performance certifications.
- Compliance declarations.
- Warranty information.
- Authorized supplier credentials.
Comparison of Municipal Dewatering Equipment Priorities
| Feature | Low Quality Equipment | Professional Municipal Equipment |
|---|---|---|
| Reliability | Inconsistent | High |
| Service Life | Shorter | Long-term |
| Emergency Performance | Limited | Consistent |
| Maintenance Cost | Often Higher | More Predictable |
Practical Advice for Suppliers
In many cases, evaluators appreciate bids that clearly demonstrate compliance rather than forcing reviewers to search through lengthy attachments. Suppliers preparing proposals for the MCL Dewatering Sets Tender 2026 should organize technical documents logically and provide clear references to specifications, certifications, and supporting evidence. This approach improves clarity and can make the evaluation process smoother for both parties.
How to Apply Through EPADS
The MCL Dewatering Sets Tender 2026 will be processed entirely through the Electronic Procurement and Disposal System (EPADS). All interested contractors must submit their bids electronically within the specified deadline. Understanding the submission process beforehand can save valuable time and help avoid technical issues on the final day.
From experience, many contractors wait until the last few hours to upload documents. This often leads to rushed submissions, missing files, or upload failures. Government procurement systems can experience heavy traffic near closing time, making early preparation a smart strategy.
Step-by-Step EPADS Submission Process
Contractors planning to participate should follow a structured approach to ensure full compliance with procurement requirements.
- Register or log in to your EPADS account.
- Locate the relevant tender notice.
- Download the bidding documents.
- Review technical and financial requirements carefully.
- Prepare all required documents.
- Sign and stamp the bidding documents.
- Convert documents into PDF format.
- Upload all files through EPADS.
- Upload the scanned copy of bid security.
- Submit the electronic bid before the deadline.
Important Submission Dates
| Activity | Date & Time |
|---|---|
| Bid Submission Deadline | 19 June 2026 at 10:30 AM |
| Tender Opening Date | 19 June 2026 at 11:00 AM |
Bids submitted after the deadline are generally not considered. Procurement systems automatically enforce closing times, so late submissions can result in immediate disqualification.
Hard Copy Requirements
Although the bidding process is electronic, contractors must also provide the original financial instrument related to earnest money. The original Call Deposit Receipt (CDR) should be submitted according to the tender instructions before the bid closing time.
- Original CDR must be available.
- Scanned copy must be uploaded online.
- Company letterhead should accompany required documents.
- Authorized signatures are mandatory.
- Incomplete submissions may be rejected.
Common Submission Mistakes to Avoid
One common mistake people make is uploading documents without checking file readability. According to procurement regulations, unreadable, corrupted, or virus-infected files may result in bid rejection.
- Uploading incorrect documents.
- Missing signatures or stamps.
- Submitting incomplete bid security documents.
- Uploading low-quality scanned files.
- Waiting until the final minutes before submission.
- Using outdated company information.
Practical Compliance Checklist
| Requirement | Verified |
|---|---|
| EPADS Registration Active | ✓ |
| Documents Signed & Stamped | ✓ |
| PDF Files Prepared | ✓ |
| Bid Security Uploaded | ✓ |
| Original CDR Submitted | ✓ |
Expert Recommendation
In many cases, the difference between a successful bid and a rejected one comes down to preparation. Contractors participating in the MCL Dewatering Sets Tender 2026 should complete uploads at least one day before the deadline and carefully review every document before final submission. A well-organized bid not only reduces compliance risks but also reflects professionalism during the evaluation process.
Earnest Money and Financial Requirements
Financial compliance is one of the most closely reviewed aspects of the MCL Dewatering Sets Tender 2026. Even if a contractor submits a technically strong proposal, failure to meet bid security requirements can lead to immediate rejection. This is why bidders should pay special attention to earnest money instructions before uploading their proposals.
From experience, procurement authorities treat bid security as proof of a bidder's seriousness and financial commitment. It helps discourage non-serious participation and protects the procuring agency from unnecessary administrative costs.
What Is Earnest Money?
Earnest money, often called bid security, is a financial guarantee submitted by a contractor when participating in a government tender. The amount is usually calculated as a percentage of the estimated project cost and must be provided in the format specified by the procuring agency.
For the MCL Dewatering Sets Tender 2026, bidders are required to submit earnest money equal to 3% of the estimated project value.
Earnest Money Calculation
| Item | Amount |
|---|---|
| Estimated Tender Cost | Rs. 3,687,000 |
| Required Bid Security | 3% |
| Approximate Earnest Money | Rs. 110,610 |
Bidders should verify calculations independently and follow the official tender documents in case of any clarification or amendment issued by the procuring agency.
Accepted Financial Instrument
According to the tender notice, earnest money must be submitted in the form of a Call Deposit Receipt (CDR) issued by a scheduled bank. Contractors should ensure the financial instrument remains valid throughout the bidding process.
- CDR from a scheduled bank.
- Original financial instrument required.
- Scanned copy uploaded through EPADS.
- Compliance with procurement regulations mandatory.
- Supporting documents should match uploaded records.
Financial Submission Requirements
One common mistake people make is assuming that uploading a scanned copy is enough. The tender clearly requires submission of the original financial instrument before bid closing. Failure to provide the original document can create compliance issues during evaluation.
| Requirement | Mandatory |
|---|---|
| Upload Scanned CDR | Yes |
| Submit Original CDR | Yes |
| Company Letterhead | Yes |
| Authorized Signature | Yes |
Pros and Cons of the Earnest Money Requirement
| Pros | Cons |
|---|---|
| Discourages non-serious bidders. | Requires temporary capital commitment. |
| Improves procurement transparency. | Additional banking documentation needed. |
| Protects public procurement interests. | Errors may lead to bid rejection. |
Financial Compliance Tips for Bidders
In many cases, contractors focus heavily on pricing and overlook financial documentation. Before submitting a bid for the MCL Dewatering Sets Tender 2026, verify that the CDR amount, company details, signatures, and supporting records match exactly across all submitted documents. Small inconsistencies can create unnecessary delays or compliance concerns during evaluation.
Important Dates and Tender Schedule
Keeping track of deadlines is essential when participating in the MCL Dewatering Sets Tender 2026. Government procurement opportunities follow strict schedules, and missing even a single deadline can result in automatic disqualification regardless of a contractor's qualifications or pricing.
From experience, the most successful bidders start preparing documents several days before submission. This provides enough time to verify technical records, financial documents, signatures, and EPADS uploads without last-minute pressure.
Official Tender Timeline
The following schedule has been announced for the procurement process. Contractors should mark these dates and plan their activities accordingly.
| Tender Activity | Date & Time |
|---|---|
| Bid Submission Deadline | 19 June 2026 at 10:30 AM |
| Bid Opening Date | 19 June 2026 at 11:00 AM |
| Project Completion Period | 30 Days |
Why Early Preparation Matters
One common mistake people make is treating the submission deadline as the day to start uploading documents. Procurement portals often require multiple files, and any technical issue can become a serious problem if discovered at the last moment.
Experienced contractors usually complete uploads at least 24 hours before the official deadline. This allows enough time to resolve scanning issues, file size limitations, signature problems, or system-related errors.
- Review bidding documents early.
- Prepare technical documents in advance.
- Verify financial instruments before submission.
- Complete EPADS uploads before the final day.
- Keep backup copies of all submitted records.
Recommended Contractor Preparation Schedule
| Timeline | Recommended Action |
|---|---|
| 7 to 10 Days Before | Review tender documents and eligibility requirements. |
| 5 Days Before | Prepare technical and financial documentation. |
| 3 Days Before | Verify signatures, stamps, and compliance records. |
| 1 Day Before | Upload documents and confirm successful submission. |
| Tender Day | Monitor bid opening and procurement updates. |
What Happens After Bid Opening?
Once the bids are opened, the procuring agency begins the evaluation process according to the announced procurement rules. Contractors who successfully meet technical, administrative, and financial requirements move forward for detailed assessment.
In many cases, suppliers focus only on submission deadlines and forget that evaluation begins immediately afterward. Well-organized proposals often make a stronger impression because evaluators can quickly verify compliance and supporting documentation.
Planning Ahead Can Improve Success Rates
The MCL Dewatering Sets Tender 2026 follows a structured procurement schedule with no flexibility for late submissions. Contractors who prepare early, verify documentation carefully, and complete uploads before the deadline generally face fewer compliance risks. A proactive approach often proves more valuable than trying to solve problems under time pressure.
Bid Evaluation Process
After the submission deadline passes, the evaluation stage begins. This is where the procuring agency reviews every bid to determine which contractor meets the tender requirements and offers the most competitive proposal. For the MCL Dewatering Sets Tender 2026, evaluation will be conducted under the Single Stage One Envelope procedure using the Least Cost Method.
From experience, many contractors assume the lowest price automatically wins. In reality, only responsive bids that fully satisfy administrative, technical, and financial requirements reach the final price comparison stage.
How the Evaluation Process Works
The evaluation process generally follows a structured sequence. Procurement officials first verify compliance before comparing financial offers.
- Verification of submitted documents.
- Review of bid security requirements.
- Assessment of technical compliance.
- Confirmation of eligibility criteria.
- Financial evaluation of responsive bids.
- Selection of the lowest evaluated bidder.
Understanding the Least Cost Method
The Least Cost Method means that only bidders who successfully meet all tender requirements are considered for financial comparison. Once compliance has been established, the lowest evaluated responsive bid generally receives preference.
One common mistake people make is focusing entirely on reducing prices while neglecting documentation quality. A lower price provides no advantage if the bid becomes non-responsive due to missing paperwork or technical deficiencies.
Typical Evaluation Factors
| Evaluation Area | Importance |
|---|---|
| Eligibility Compliance | Mandatory |
| Bid Security | Mandatory |
| Technical Compliance | High Priority |
| Document Accuracy | High Priority |
| Financial Offer | Final Selection Factor |
Competitor Comparison: Successful vs Unsuccessful Bids
| Evaluation Area | Strong Bid | Weak Bid |
|---|---|---|
| Documentation | Complete | Missing Records |
| Technical Compliance | Fully Verified | Incomplete Evidence |
| Financial Security | Correctly Submitted | Deficient Submission |
| Bid Evaluation Result | Responsive | Non-Responsive |
Common Reasons Bids Fail Evaluation
In many procurement projects, contractors lose opportunities because of preventable errors rather than pricing issues. Evaluators frequently encounter documentation problems that immediately affect bid responsiveness.
- Missing bid security documents.
- Unsigned bidding forms.
- Incomplete technical information.
- Unreadable uploaded files.
- Failure to meet eligibility requirements.
- Incorrect financial documentation.
Expert Insight for Contractors
From experience, procurement evaluators appreciate clear, organized, and compliant submissions. Contractors participating in the MCL Dewatering Sets Tender 2026 should focus on accuracy first and pricing second. A complete and responsive proposal has a far greater chance of reaching the final financial evaluation stage than a low-priced bid with compliance issues.
Reasons Contractors Should Consider This Opportunity
The MCL Dewatering Sets Tender 2026 is more than a routine government procurement notice. For many suppliers and contractors, it represents an opportunity to build credibility, generate revenue, and establish long-term relationships within the public sector. Government contracts often create repeat business opportunities when performance meets expectations.
From experience, companies that successfully complete municipal supply projects frequently strengthen their position for future tenders. Public-sector procurement records can become valuable references when competing for similar contracts across Pakistan.
Business Growth Opportunities
Winning a government contract can provide several advantages beyond the immediate project value. Municipal authorities regularly procure equipment, maintenance services, and infrastructure-related supplies throughout the year.
- Enhanced company credibility.
- Potential for future government projects.
- Increased market visibility.
- Stronger supplier portfolio.
- Improved business references.
- Long-term procurement opportunities.
Why Municipal Projects Attract Contractors
One common mistake people make is focusing only on the announced project value. Experienced contractors often evaluate the long-term relationship potential associated with a government agency. A successful project can lead to future invitations, partnerships, and additional procurement opportunities.
In many cases, suppliers view municipal tenders as strategic investments because public-sector projects often support sustainable business growth over time.
Opportunity Comparison with Private Sector Projects
| Factor | Government Tender | Private Project |
|---|---|---|
| Transparency | High | Varies |
| Market Reputation | Strong | Moderate |
| Future Opportunities | Often Available | Project Specific |
| Procurement Process | Structured | Flexible |
Real Contractor Experience Highlights
Across contractor communities and procurement discussions, suppliers frequently mention that government projects helped them expand beyond local markets. Similar discussions on business forums often highlight how completing a single municipal contract improved credibility when pursuing larger opportunities later.
From experience, organizations evaluating suppliers often place significant value on proven government project performance. This makes even medium-sized tenders potentially valuable from a long-term business perspective.
Pros and Cons of Participating
| Pros | Cons |
|---|---|
| Builds public-sector credibility. | Requires detailed compliance. |
| Creates future bidding opportunities. | Competitive bidding environment. |
| Expands professional portfolio. | Administrative documentation required. |
| Supports long-term growth. | Strict procurement deadlines. |
Is This Tender Worth Considering?
For suppliers involved in pumping systems, municipal equipment, and water management solutions, the MCL Dewatering Sets Tender 2026 offers a practical opportunity to compete for a government-backed project. Contractors who meet the eligibility criteria and can provide compliant equipment should seriously evaluate participation, particularly if they are looking to strengthen their presence in the public procurement sector.
Common Reasons for Bid Rejection
Every year, many government tenders receive bids that are rejected before reaching the final evaluation stage. In the case of the MCL Dewatering Sets Tender 2026, even a competitive price cannot compensate for missing documents or non-compliance with procurement requirements.
From experience, most bid rejections occur because of avoidable administrative mistakes rather than technical shortcomings. Contractors who understand these risks early can significantly improve their chances of submitting a responsive proposal.
Top Reasons Government Tenders Get Rejected
Procurement authorities typically apply the same compliance standards to all bidders. Any missing or incorrect requirement can affect responsiveness during evaluation.
- Failure to submit earnest money.
- Missing signatures or company stamps.
- Late bid submission.
- Incomplete bidding documents.
- Unreadable uploaded files.
- Incorrect financial instruments.
- Failure to meet eligibility requirements.
- Conditional bids.
Bid Rejection Risk Comparison
| Issue | Risk Level | Potential Outcome |
|---|---|---|
| No Earnest Money | Very High | Immediate Rejection |
| Unsigned Documents | High | Non-Responsive Bid |
| Corrupted Files | High | Disqualification Risk |
| Late Submission | Very High | Automatic Exclusion |
| Incomplete Technical Data | Medium to High | Evaluation Failure |
Conditional Bids Can Create Problems
One common mistake people make is adding conditions that are not allowed under the tender requirements. Government procurement procedures generally require bidders to accept the stated terms and conditions without introducing unauthorized modifications.
Conditional proposals can complicate evaluation and may be treated as non-responsive depending on procurement rules and the nature of the condition imposed by the bidder.
Technical Upload Errors to Avoid
Since the MCL Dewatering Sets Tender 2026 uses EPADS, technical issues can also affect bid validity. Contractors should review every uploaded file before final submission.
- Verify PDF readability.
- Check file integrity after upload.
- Use clear document scans.
- Maintain consistent file naming.
- Confirm successful submission status.
- Retain backup copies of all records.
Responsive Bid vs Rejected Bid
| Area | Responsive Bid | Rejected Bid |
|---|---|---|
| Documentation | Complete | Missing Records |
| Financial Security | Valid | Incomplete |
| Submission Timing | Before Deadline | Late |
| Technical Compliance | Verified | Insufficient |
Expert Advice to Avoid Rejection
In many cases, bid rejection is preventable. Contractors participating in the MCL Dewatering Sets Tender 2026 should create a detailed compliance checklist before submission. Reviewing documents, financial records, signatures, and uploaded files one final time can eliminate common mistakes and improve the likelihood of progressing to the financial evaluation stage.
Final Thoughts
The MCL Dewatering Sets Tender 2026 is a practical opportunity for contractors and suppliers who deal in pumping systems, municipal equipment, and water management solutions. It is not just another tender notice, it is a structured government procurement project that can help businesses build long-term credibility in the public sector.
From experience, the contractors who succeed in these types of tenders are not always the ones offering the lowest price, but the ones who maintain strong compliance, complete documentation, and timely submission. In many cases, attention to detail becomes the real deciding factor.
If you are planning to participate, make sure you carefully review eligibility requirements, prepare your EPADS submission early, and double-check all financial documents. Small mistakes can cost you the entire opportunity, even if your technical proposal is strong.
Strong Call-To-Action
If your company is eligible and you already deal in dewatering systems or similar municipal equipment, this is the right time to take action. Government tenders like this do not stay open for long, and preparation plays a critical role in success.
Take the next step today. Download the official bidding documents, verify your compliance checklist, and prepare your submission before the deadline. Early preparation can significantly improve your chances of winning the MCL Dewatering Sets Tender 2026.
Frequently Asked Questions (FAQs)
1. Who is issuing the MCL Dewatering Sets Tender 2026?
The tender is issued by the Metropolitan Corporation Lahore (MCL) for municipal drainage and water management requirements.
2. What is the last date for bid submission?
The last date for submission is 19 June 2026 at 10:30 AM through the EPADS system.
3. When will the tender be opened?
The bids will be opened on 19 June 2026 at 11:00 AM, immediately after the submission deadline.
4. What is the earnest money requirement?
Bidders must submit 3% of the estimated cost as earnest money in the form of a Call Deposit Receipt (CDR).
5. Who is eligible to apply?
Eligible contractors, suppliers, and firms registered with EPADS and capable of supplying dewatering sets and accessories can apply.
6. What is the estimated cost of the project?
The estimated cost of the tender is approximately Rs. 3.687 million.
7. What procurement method is being used?
The procurement follows a Single Stage One Envelope method with evaluation based on the Least Cost Method.



